SOLUTIONS
Problem:
Community College in Maryland needed
to reduce energy costs and provide a more comfortable working and learning
environment.
Solution: Greenfuse team with energy-efficient
designer/mechanical engineers and lighting designer conducted week-long,
comprehensive energy and lighting reduction audit. Provided 120+ page
report documenting recommendations, implementation schedule, summary
of savings equaling 26%, and an ROI average of 33%, and 3-year payback.
Problem:
Community College in Maryland wanted to measure and report the emissions
(CO2, etc.) from its operations.
Solution:
Greenfuse team with emissions quantification expert collected
equipment energy use data, as well as direct and indirect emissions
data, and vehicle miles traveled to establish a baseline. Then, based
on energy reduction program implementation, Greenfuse quantified direct
and indirect emissions reduction impacts of each option.
Problem:
Client wanted to replace existing, old technology chilled water
plant (mid-'70s) to reduce energy & maintenance costs. Expressed
concern about water used by equipment.
Solution: Recommended replacing
with a more efficient screw-compressor-based chiller and cooling tower
(draw-through), and updating with variable speed pumps. Installed waterless
urinals to compensate for water use in the chiller.
Problem: Client
wanted to renovate and add more space to existing building and achieve
LEED certification. Already had one design that would not achieve certification
at any level.
Solution: Greenfuse and its architect
and engineer worked with the client and their local architect to revise
the design to achieve LEED gold or silver level. Greenfuse also secured
a $30,000 grant from the state's energy office to support the redesign
for LEED certification.
Problem: State
university in California needed to reduce water use on campus, based
on limited local water supply.
Solution: Greenfuse worked with
the client and identified the best no-water using urinal manufacturer
to conduct a pilot in a key building. The manufacturer provided 4 urinals
for a 6-month pilot which resulted in a campus-wide program.
Problem:
Community-based organization in Monterey County needed to
expand its board and membership support to fulfill its vision of a new
center, with an ecologically-sensitive design.
Solution: Greenfuse worked with
the director and key board members to plan and implement a robust strategic
planning session, resulting in a document to be used for fund- and friend-raising.